Willmott dixon online induction

Description > Willmott dixon online induction

Click on link to DOWNLOAD:Willmott dixon online induction - Link

Safety was a firm priority for Willmott Dixon at its Centenary Quay Phase 3 project in Woolston, Southampton — a mixed use retail and residential development situated in the historic ship building yards alongside the River Itchen. The induction introduced a pre-enrolment scheme on site which ensured that all future site operatives received a prior induction online before arriving on site, and this was commended for its innovative safety values by the Scheme. Its outstanding levels of best practice led to Willmott Dixon Construction receiving a Gold Award in the Considerate Constructors Scheme National Site Awards 2016. As there was initially no electrical power on the site, both the offices and construction areas were powered via generators. Super-silenced models with acoustic fenced enclosures were utilised. The Scheme is driving all contractors to ever higher standards across multiple disciplines that are not necessarily related directly to the build process, but are critical in ensuring contractors work with local communities. And more importantly, leave a lasting legacy within the local area once the project is complete. I would dixon Willmott recommend the Scheme. It is a public declaration of intent to strive to positively affect the local community and its workforce throughout and beyond the construction phase. All deliveries were required to adhere to a strict traffic plan and this information was issued at the pre-order stage to each supply chain member. The Scheme helps to promote all construction skills and around 80 online from years eight and nine benefited from the presentation. Wood community recycling schemes also benefited from waste collected from the project, helping the team to ensure that its waste diverted from landfill was over 97%. The team carried out weekly litter picks on the foreshore. The link facilitated a comprehensive update of environmental credentials and achievements relating to the site which could be relayed to meetings. This was also the forum where individuals were nominated by their peers for recognition of safety performance, or particularly good attitudes towards safety standards. These visits were supplemented by regular checks by the site management team. The process involved a set test and included the compilation of operative information, a medical conditions and contact details in case of emergency. This gave operatives the chance to get their health checked and possibly give blood.

Last updated